Research prototypeData of October 2026

How we built it

Open the mapStreet by street in the three valleys, and every municipality in Europe. Phone app"Is my place at risk?" for your location or any EU municipality.

Before a river flood, a crisis cell needs to know which streets go under first, and how many days it has. In July 2021 the pieces existed: flood maps showed where water could go, and rain forecasts showed a lot of rain coming. What was missing was one answer per street and per day. This prototype gives that answer for three valleys hit in 2021, and a coarser one for every municipality in Europe.

A few terms used below. A 10-year flood is a flood big enough to have a 1-in-10 chance of happening in any given year; a 100-year flood is rarer and bigger (1 in 100). EFAS is the European Flood Awareness System of Copernicus; its flood maps cover rivers draining more than about 500 km². AUC measures how well a score puts flooded buildings above dry ones: 1 is perfect, 0.5 is a coin toss.

The whole chain

Two models answer two separate questions. Their answers are combined for each building, every day.

InputsTerrain and buildings
  • Copernicus 30 m terrain and the streams we derived from it
  • 1.4 million buildings (GHS-OBAT)
  • EFAS flood depths

Learns from: official flood-hazard maps of Wallonia, North Rhine-Westphalia and Rhineland-Palatinate, and the area flooded in July 2021

Model 1 · trained onceBuilding modelGradient-boosted trees, 20 copies
For each buildingChance it is reachedd10d100d500dextby a 10, 100 or 500-year flood, or by an extreme flood like July 2021
InputsRain
  • Rain of the past month (ERA5, NASA POWER)
  • Rain forecast for the next 3 days (NOAA GEFS, ECMWF)
  • 30 years of yearly rain records per basin

Learns from: 4 river gauges (SPW Wallonia), and a runoff estimate calibrated on them for the other 35 basins

Model 2 · run every dayFlood modelRare-rain statistics plus a gauge-trained model, for each of 39 river basins
For each basin, next 3 daysChance of each flood sizep2p10p100p500chance the river goes above its 2, 10, 100 and 500-year level
Every building, every dayRisk = for each flood size, its chance × the chance the building is reached, added up Get out: central risk ≥ 10 %

1. Which buildings get wet

Every building in the three valleys (the Vesdre in Belgium, the Ahr and Erft in Germany, the Geul and Rur on the Dutch-German border) is described by what decides whether water reaches it:

What it learns from. North Rhine-Westphalia and Rhineland-Palatinate publish maps of frequent, 100-year and extreme floods, down to small streams. Wallonia publishes hazard classes, which we translate into the same three sizes. The model learns which combinations of terrain put a building inside each zone. A fourth class, for anything beyond the 500-year flood, learns from the area that actually flooded in July 2021. The model is trained 20 times on resampled data, and the spread of the 20 answers gives its uncertainty.

The result is four numbers per building: the chance it is reached by a 10, 100 or 500-year flood, and by an extreme flood like July 2021. A bigger flood can never score lower than a smaller one. Across the Dutch border there is no regional map to learn from, and the scores there are weak (see the tests).

2. How big a flood is coming

The three valleys are split into 39 river basins of about 15 to 350 km² each. Every day, for each basin, we take the heaviest 1 to 5-day rain expected over the next 3 days, add a share of the rain of the past month (wet ground floods sooner), and compare it with the basin's yearly rain records from 1990 to 2020. That tells how rare the coming rain is: a 1-in-10-year rain, a 1-in-100-year rain. We then assume that a 1-in-100-year rain gives a 1-in-100-year flood. This assumption is not calibrated, and it is the weakest link of the tool (see the tests). Forecast rain is never exact, so this estimate is spread using the errors the forecast made in the past.

For ordinary floods, a second model gives the chance that the river goes above its 2-year level, roughly when it leaves its bed. It is trained on 4 river gauges, and on a runoff estimate calibrated on them for the 35 basins without a gauge. Its chances are then adjusted to how well it did with real past forecasts.

3. From chance to action

The forecast gives chances that the river goes above each level. Subtracting them splits the next three days into separate outcomes that cannot both happen: a flood between the 2 and 10-year level, between 10 and 100, between 100 and 500, or beyond 500. For each outcome we multiply its chance by the chance that the building is reached (the average of the two flood sizes that bound it, counting 0 at the 2-year level), then add the outcomes. The result is the chance that river water reaches the building within 3 days. An example for one house on one day:

Outcome in the next 3 daysIts chanceHouse reachedAdds
Flood between the 2 and 10-year level60 − 30 = 30 %(0 + 2) / 2 = 1 %0.3 %
Between 10 and 100-year30 − 12 = 18 %(2 + 28) / 2 = 15 %2.7 %
Between 100 and 500-year12 − 6 = 6 %(28 + 52) / 2 = 40 %2.4 %
Beyond 500-year6 %80 %4.8 %
Risk for this house10.2 %

Forecast for this day: 60 % above the 2-year level, 30 % above the 10-year, 12 % above the 100-year, 6 % above the 500-year. House: 2 %, 28 %, 52 % and 80 % chance of being reached by a 10-year, 100-year, 500-year and extreme flood. Most of its risk comes from the rare floods: unlikely, but if they come, this house is most likely in the water.

Both models also give a pessimistic estimate, the upper end of their uncertainty. The same sum with those numbers is the pessimistic risk.

!

Get out when the central risk reaches 10 %. Plan the evacuation of these streets. The house above is at Get out.

Prepare to get out (called Warning in the phone app) when the pessimistic risk reaches 7 %. Move cars, empty cellars, check on neighbours who will need help leaving.

✓

Safe otherwise. Not a promise: a small stream, a blocked drain or runoff from a field can still flood these buildings.

We accept many false alarms to miss fewer floods: a needless evacuation costs a night away from home, a missed one can cost lives. The thresholds were set so that, replaying July 2021, Verviers reaches Prepare to get out on 11 July and Get out on 12 July, two days before the peak, while keeping false alarms over 2024 to 2026 as low as possible (most of those days are replayed with the rain that really fell). They are policy choices, and the settings panel lets you move them. A street takes the colour of its worst-placed buildings.

The map also marks, as Prepare to get out, streets that are fine with the forecast as it stands but would not be if the rain kept falling: today's rain for three more days, or the 3-day forecast stretched to a week. This is a stress test. It shows where to prepare first if the forecast turns out too low.

Europe

Outside the three valleys there are no building-level hazard maps, so the Europe view works per municipality: 98,188 of them in 34 countries. For each one we count the residents living inside the EFAS 10, 100 and 500-year flood zones. The rare-rain method of step 2 (without the gauge model) gives the chance of each flood size in its main river basin, from E-OBS rain records since 1991. The same subtraction as in step 3 gives the expected number of people in the water.

A municipality goes to Get out when a 100-year flood has at least a 25 % chance and about 100 people or more are expected in the water. It goes to Prepare to get out when, in the pessimistic estimate, a 10-year flood has at least a 15 % chance and 10 people or more are expected in the water. You can replay any day from 1991 to December 2025, with the rain that really fell.

How we tested it

The models were tested on data they had not seen. The alert thresholds were not: they were set on July 2021 and on the Europe events below, so results for those events are flattering.

Seven floods the model never saw

Copernicus mapped eight later floods from satellite images; one had no flooded building in our data. That leaves the Yser (Nov 2023), Lower Saxony (Dec 2023), the Saar (Jan and May 2024), Bavaria and Baden-Württemberg (late May 2024), and Dresden and Brandenburg (Sep 2024): about 3,350 buildings seen under water, in 20 mapped areas. We retrained the same recipe on the three valleys (5 copies instead of 20) and ran it there with no regional map.

0.85AUC of our 100-year score
0.80AUC of the EFAS 500-year water depth
0.62AUC of height above the stream alone
15 of 20Areas where our score beats EFAS (12 of 20 with our 500-year score)

The model works far from where it was trained. On the 1,035 flooded buildings outside the EFAS zones it still scores 0.77. On big rivers EFAS is more precise: its 500-year zone held 69 % of the flooded buildings, and our score needs to flag twice as many buildings to catch 75 %. Satellite maps also miss water between houses, so these numbers come from a sample of the flooded buildings.

Small streams, July 2021

Of the 42,500 buildings that flooded in the three valleys, 27,000 (64 %) were outside the EFAS maps. For this test we replaced the July 2021 class with the 500-year class, so the building scores come only from the regional maps, and used the forecast issued on 13 July, the day before the peak, by a model trained without 2021:

Buildings that really floodedGet outPrepare to get out or Get out
Inside the EFAS maps91 %99 %
Outside (small streams, valley edges)57 %81 %

The thresholds were still set on 2021, so this is not a fully independent test. The price is false alarms: that day, among the buildings near the flooded areas that stayed dry, 21 % were at Prepare to get out and 9 % at Get out. The map itself uses the July 2021 class and scores higher on 2021, but it learned from that flood.

The flood forecast

0.92AUC for the river above its 2-year level within 3 days, using the forecasts issued at the time, each year scored by a model trained on the other years (0.94 on the 4 real gauges)
~1 dayLead time of the 100 and 500-year chances in July 2021; the earlier Verviers alerts came from the smaller flood sizes
2 of 59Days with a 10-year flood or more at 6 gauges that the rare-rain method flagged, even with the rain that really fell

The last number is the main weakness. In an event like July 2021, extreme rain and extreme floods line up and the tool warns in time. In ordinary years they often do not: most 10-year floods follow rain that was not rare, and the tool misses them. The forecast also ranks days well (high AUC) but its chances are only slightly better than the average flood frequency.

Europe, five real floods

3 days before the peakMunicipalities in the Copernicus mapping areas at Prepare to get out or Get outat Get outOther exposed municipalities at Get out
July 2021 (BE, DE, NL)81 %51 %15 %
Emilia-Romagna, May 202388 %53 %1 %
Slovenia, Aug 202392 %40 %10 %
Storm Boris, Sep 202479 %25 %6 %
Valencia, Oct 202438 %1 %1 %

A best case: these replays use the rain that really fell, and the rule was tuned on these events. "Other exposed municipalities" had the same storm and are not all dry. Europe-wide, the tool says where to look, not which town of a valley floods. Valencia shows the limit: a very local storm, too small for a 25 km rain grid, on streams EFAS does not map.

What it cannot do

  1. See small streams outside the three valleys. The Europe view relies on EFAS. In July 2021, about 4 in 10 people in the flooded area lived outside its maps: half along small streams EFAS does not model, half just beyond the edge of its zones.
  2. Warn long before the worst floods. The extreme flood sizes rose about one day before the July 2021 peak, not three. Gauges and hydrological models (EFAS, national services) do better than rain alone.
  3. Prove its thresholds. 7 % and 10 % were set on July 2021 and have not been tested on an independent major flood. Expect more false alarms, or fewer catches, on a new event.
  4. Say how deep or how fast. It gives the chance that water reaches a building, not its depth, speed or arrival time.
  5. Be trusted in the Netherlands. Trained without Dutch data and tested there, the building model is no better than chance (AUC 0.54).
  6. Update itself. This copy holds the forecasts of 29 and 30 October 2026. Only 4 of the 39 basins have gauge records in our data.

Data

WhatSourceUsed for
BuildingsGHS-OBAT 2024 (JRC)1.4 M buildings: location, height, footprint, use, age
TerrainCopernicus DEM GLO-30Height above stream, slope, our stream network
Rivers, basinsHydroSHEDS39 pilot basins, about 6,650 in Europe
European flood zonesEFAS hazard maps (Copernicus EMS, JRC)Model input; residents in flood zones in Europe
Regional flood zonesSPW ALEA (Wallonia), ELWAS (NRW), LfU HWGK (RLP)What the building model learns from
Observed floodsCopernicus EMS rapid mapping, SPW, PDOK, KIT-CEDIMJuly 2021 for training; 2023 and 2024 for testing only
RainERA5, NASA POWER, E-OBS; forecasts NOAA GEFS, ECMWF IFSRain records per basin, past and forecast rain
GaugesSPW HydrométrieOrdinary-flood labels (4 basins)
People, municipalitiesGHS-POP 2020 (JRC), GISCO 2021 (Eurostat)Residents per flood zone and municipality

Who made it

A small team at the European AI Challenge 2026 (FARI and the EU Joint Research Centre, Brussels, 29 and 30 October 2026). Much of the code was written with an AI coding assistant; the methods, thresholds and every number here were chosen and checked by us against the data. The site collects no personal data.

Not an official warning service. In danger, call 112 and follow your local authorities, BE-Alert, NINA or NL-Alert. Basemap © OpenStreetMap contributors © CARTO. Flood maps © European Union, Copernicus Emergency Management Service. GHSL © European Union, JRC. E-OBS: Copernicus Climate Change Service and ECA&D. Data from Land NRW (dl-de/by-2.0), LfU Rheinland-Pfalz, SPW Wallonie and PDOK.